A
-
Abdolahi, Mohammad Javad
Investigation the effect of job satisfaction factors on safety in civil project [Volume 2, Issue 2, 2017, Pages 32-36]
-
Abdolahnejad, Ibrahim
Investigation and evaluation of construction and commissioning risks in construction projects (Case Study: Hospital) [Volume 2, Issue 3, 2017, Pages 36-45]
-
Abdolah Zadeh, Gholam Reza
Optimal Selection of Steel and Concrete Structures using ELECTERE Method [Volume 2, Issue 2, 2017, Pages 14-19]
-
Amini Puya, Hadi
The Relationship of Transformational Leadership and Human Resource Efficiency with the Continuity Approach to Corporate Life
(Case study: Eastern Azarbayjan Construction Contractor companies) [Volume 2, Issue 4, 2018, Pages 11-22]
B
-
Bagheri Dadvokalaii, Omid
Determine the best place to implement groundwater artificial pond design by using two methods of boolean and AHP [Volume 2, Issue 1, 2017, Pages 12-16]
-
Barmayehvar, Behnod
Management strategy design, construction and project supervision
The emergency plan for river protection kan [Volume 2, Issue 2, 2017, Pages 20-26]
-
Barmayehvar, Behnod
Investigation the effect of job satisfaction factors on safety in civil project [Volume 2, Issue 2, 2017, Pages 32-36]
-
Behdadfar, Fatemeh
Optimal Selection of Steel and Concrete Structures using ELECTERE Method [Volume 2, Issue 2, 2017, Pages 14-19]
D
-
Dalili khanghah, Kazem
Investigation of Hydraulic Performance of the Stairs Transitional Field (SEDEX PROFILE) on the Upper Slope Step overflow (Case Study: Jahve dam) [Volume 2, Issue 1, 2017, Pages 7-11]
-
Dashti Nasser Abadi, Heydar
Effects of applying knowledge management on the implementation of reduced time in development projects [Volume 2, Issue 4, 2018, Pages 24-29]
E
-
Ehsandoost, Mohammadreza
An Overview of the Seismic Vulnerability and Strategies for Strengthening Brick Structures Unarmed Case Study: Iran [Volume 2, Issue 3, 2017, Pages 28-35]
-
Eshtehardian, Ehsan
Implementing the critical chain method for managing linear-repetitive projects such as road construction, taking into account the conditions of uncertainty and risk [Volume 2, Issue 3, 2017, Pages 46-55]
F
-
Fardad, Mehrdad
Effects of applying knowledge management on the implementation of reduced time in development projects [Volume 2, Issue 4, 2018, Pages 24-29]
H
-
Haghighi, Farshidreza
Implementing the critical chain method for managing linear-repetitive projects such as road construction, taking into account the conditions of uncertainty and risk [Volume 2, Issue 3, 2017, Pages 46-55]
-
Hamzezadeh, Mohsen
Knowledge management impact on economic productivity of knowledge-based projects [Volume 2, Issue 1, 2017, Pages 22-31]
-
Hassani Fakhrabadi, Iraj
Management strategy design, construction and project supervision
The emergency plan for river protection kan [Volume 2, Issue 2, 2017, Pages 20-26]
-
Hematian, Milad
Implementing the critical chain method for managing linear-repetitive projects such as road construction, taking into account the conditions of uncertainty and risk [Volume 2, Issue 3, 2017, Pages 46-55]
J
-
Jahankohan, Mohammad
Provide a model of the impact of Value Engineering and Organizational Agility in improving the competitiveness of construction industry companies [Volume 2, Issue 4, 2018, Pages 30-42]
-
Jalalai, Gholamreza
The utilization of a traditional water supply system with construction management in accordance with the passive defense approach
(Case study: Traditional water supply in Yazd province) [Volume 2, Issue 2, 2017, Pages 5-13]
-
Javaheri Barforooshi, Maedeh
The study of Difficulties Encountered in Supervision of Construction Projects in the Monitoring System of Iran Using the FMEA and Providing a Solution to Improve it [Volume 2, Issue 2, 2017, Pages 37-42]
K
-
Karimi, Saeid
Developing a fuzzy Topsis decision-making model to select the optimal place to buy real estate in Tehran from an investor's point of view. [Volume 2, Issue 4, 2018, Pages 43-53]
-
Kavianpuor, Mohammadreza
Investigation of Hydraulic Performance of the Stairs Transitional Field (SEDEX PROFILE) on the Upper Slope Step overflow (Case Study: Jahve dam) [Volume 2, Issue 1, 2017, Pages 7-11]
-
Khavaninzadeh, Reza
Evaluation of methods for the stabilization of rocky slopes and slopes with a time-cost reduction approach (case study: Abali slopes) [Volume 2, Issue 4, 2018, Pages 54-60]
M
-
Mahmoudi Hasankhanlo, Reza
Evaluating the Effect of BIM in the Design Phase to Reduce Construction Claims [Volume 2, Issue 3, 2017, Pages 9-16]
-
Marefat, Akbar
Evaluating the Effect of BIM in the Design Phase to Reduce Construction Claims [Volume 2, Issue 3, 2017, Pages 9-16]
-
Mirjafari, Seyed Shahabaldin
Evaluation indexes quality, cost and time at Lightweight steel structures (case study:LSF structures in yazd city) [Volume 2, Issue 1, 2017, Pages 37-42]
-
Mirmohammadsadeghi, Sayed Alireza
Provide a model of the impact of Value Engineering and Organizational Agility in improving the competitiveness of construction industry companies [Volume 2, Issue 4, 2018, Pages 30-42]
-
Mirsaeedi, Leila
Architectural Design of Clean Rooms in Pharmaceutical Industry [Volume 2, Issue 1, 2017, Pages 17-21]
-
Mohammadvali samani, Jamal
Determine the best place to implement groundwater artificial pond design by using two methods of boolean and AHP [Volume 2, Issue 1, 2017, Pages 12-16]
-
Motahari, Mohammad reza
Application of ANN in Prediction of Vibration Caused By Blast Operation, Case Study Shur River Dam [Volume 2, Issue 2, 2017, Pages 27-31]
N
-
Nazari, Ahad
Investigation and evaluation of construction and commissioning risks in construction projects (Case Study: Hospital) [Volume 2, Issue 3, 2017, Pages 36-45]
-
Nekooie, Mohammadali
Evaluation of the vulnerability of components of the water supply system [Volume 2, Issue 1, 2017, Pages 32-36]
-
Nekooie, Mohammad Ali
The utilization of a traditional water supply system with construction management in accordance with the passive defense approach
(Case study: Traditional water supply in Yazd province) [Volume 2, Issue 2, 2017, Pages 5-13]
P
-
Parvari, Ali
Legal review of BOT and EPC contracts in road construction projects [Volume 2, Issue 3, 2017, Pages 17-27]
-
Paziki, Majid
Analytical allocation of new construction methods based on future residential demand to modify residential construction efficiency plan [Volume 2, Issue 4, 2018, Pages 1-9]
-
Piri, Hassan
The utilization of a traditional water supply system with construction management in accordance with the passive defense approach
(Case study: Traditional water supply in Yazd province) [Volume 2, Issue 2, 2017, Pages 5-13]
R
-
Rahmatinia, Milad
Investigation and evaluation of construction and commissioning risks in construction projects (Case Study: Hospital) [Volume 2, Issue 3, 2017, Pages 36-45]
-
Ravanshadnia, Mahdi
Analytical allocation of new construction methods based on future residential demand to modify residential construction efficiency plan [Volume 2, Issue 4, 2018, Pages 1-9]
-
Roudbari, Sare
Evaluation of the vulnerability of components of the water supply system [Volume 2, Issue 1, 2017, Pages 32-36]
S
-
Sabzi, Zahra
Evaluation of methods for the stabilization of rocky slopes and slopes with a time-cost reduction approach (case study: Abali slopes) [Volume 2, Issue 4, 2018, Pages 54-60]
-
Salami, Ebrahim
The Relationship of Transformational Leadership and Human Resource Efficiency with the Continuity Approach to Corporate Life
(Case study: Eastern Azarbayjan Construction Contractor companies) [Volume 2, Issue 4, 2018, Pages 11-22]
-
Sarvarian, Javad
Determine the best place to implement groundwater artificial pond design by using two methods of boolean and AHP [Volume 2, Issue 1, 2017, Pages 12-16]
-
Sheikhi, Nahid
Weighing and Prioritizing of Factors Influencing on Employee Productivity in Construction Industry by Methods of Decision Making of Multi-Criteria Electricians [Volume 2, Issue 3, 2017, Pages 4-8]
T
-
Taheri Amiri, Mohammad Javad
Implementing the critical chain method for managing linear-repetitive projects such as road construction, taking into account the conditions of uncertainty and risk [Volume 2, Issue 3, 2017, Pages 46-55]
-
Taheri Amiri, Mohammad Javad
The study of Difficulties Encountered in Supervision of Construction Projects in the Monitoring System of Iran Using the FMEA and Providing a Solution to Improve it [Volume 2, Issue 2, 2017, Pages 37-42]
-
Taherkhani, Roohollah
Evaluation of the vulnerability of components of the water supply system [Volume 2, Issue 1, 2017, Pages 32-36]
-
Toosi, Hossein
Evaluating the Effect of BIM in the Design Phase to Reduce Construction Claims [Volume 2, Issue 3, 2017, Pages 9-16]
V
-
Vafaei, Amin
Application of ANN in Prediction of Vibration Caused By Blast Operation, Case Study Shur River Dam [Volume 2, Issue 2, 2017, Pages 27-31]
-
Valizadeh, Dariush
Legal review of BOT and EPC contracts in road construction projects [Volume 2, Issue 3, 2017, Pages 17-27]
-
Valizadeh, Soudabeh
Legal review of BOT and EPC contracts in road construction projects [Volume 2, Issue 3, 2017, Pages 17-27]
Z
-
Zare, Ibrahim
An Overview of the Seismic Vulnerability and Strategies for Strengthening Brick Structures Unarmed Case Study: Iran [Volume 2, Issue 3, 2017, Pages 28-35]
-
Zeighami, Ehsan
The study of Difficulties Encountered in Supervision of Construction Projects in the Monitoring System of Iran Using the FMEA and Providing a Solution to Improve it [Volume 2, Issue 2, 2017, Pages 37-42]
-
Zivari, Amin
Weighing and Prioritizing of Factors Influencing on Employee Productivity in Construction Industry by Methods of Decision Making of Multi-Criteria Electricians [Volume 2, Issue 3, 2017, Pages 4-8]
Your query does not match with any item